The metal plating industry has to remove Cr⁶⁺ almost completely, to below 0.1 mg/L. It does this by controlled chemical reduction, then by precipitation of Cr(OH)₃. The key is acidic pH, the right reducing agent and disciplined ORP monitoring.
Wastewater from galvanizing and electroplating usually carries hexavalent chromium (Cr⁶⁺) at high levels. This form is toxic and dissolves very easily. Indonesian regulations push the Cr⁶⁺ discharge threshold down to 0.1 mg/L. Therefore treatment must drive Cr⁶⁺ down to near or below this figure.
The method works in two steps. First, the wastewater is acidified and dosed with a reducing agent, so Cr⁶⁺ converts to Cr³⁺ (trivalent). Second, the pH is raised, so Cr³⁺ precipitates as Cr(OH)₃. ORP monitoring (Oxidation-Reduction Potential, a measure of oxidation–reduction conditions in mV) is important here. It shows that the reduction reaction is complete before precipitation begins. In practice, the system uses a stirred reaction tank with pH and ORP probes and automatic chemical dosing.
Chemical reduction at acidic pH
Reduction is fastest in an acidic environment. In operation, Cr⁶⁺ wastewater is acidified, usually with H₂SO₄, to a pH of about 2. EPA guidance gives a target pH of 1.8–2.0 (nepis.epa.gov).
The usual reducing agent is sodium bisulfite (NaHSO₃, or sodium metabisulfite). The stoichiometry is: Na₂Cr₂O₇ + 3 NaHSO₃ + 2.5 H₂SO₄ → Cr₂(SO₄)₃ + other products (≈3 mol NaHSO₃ per 2 atoms Cr) (nepis.epa.gov). In the field, the bisulfite dose is set slightly in excess on purpose, about a 3:1 weight ratio of NaHSO₃:Cr (plus the appropriate acid dose), to drive the reaction to completion. Studies note practice with an excess of up to about 3 molar bisulfite per Cr, with enough H₂SO₄ to hold the pH at about 2.0. An underdose leaves Cr⁶⁺. An overdose wastes chemicals.
Ferrous sulfate alternative and sludge impact
Another option is ferrous sulfate (FeSO₄). The key reaction is: Cr₂O₇²⁻ + 6 Fe²⁺ + 14 H⁺ → 2 Cr³⁺ + 6 Fe³⁺ + 7 H₂O. That is about 3 Fe²⁺ per atom Cr. The FeSO₄ dose is usually stoichiometric or slightly in excess. Its advantage is that it is relatively independent of pH (nepis.epa.gov). Sulfite is different. It slows down above pH 5.
The consequence is more sludge. One EPA source states FeSO₄ produces about 4× the sludge volume of the SO₂/NaHSO₃ process (nepis.epa.gov). On cost, the prices of both materials move with the market and vary between suppliers. Therefore both need to be compared through current quotations before they are used as a basis for OPEX calculations.
ORP and process pH control
Holding pH around 2 during reduction is important. Low pH speeds up kinetics and keeps chromium dissolved. For continuous operation, guidelines state ORP ~250–300 mV at pH ≈1.8–2.0 (nepis.epa.gov). Other field practice uses NaHSO₃ at pH 2–3 (adjusted with H₂SO₄) with ORP around +250 mV or lower and a contact time of ~45 minutes.
Another example: the system is acidified to the setpoint (around pH 2–3), then reducing agent is added until ORP ≈+280 mV (yokogawa.com). Another plant report uses NaHSO₃ at pH 2.0 and adds bisulfite until ORP +300 mV. It then mixes for ~15 minutes before neutralization (nepis.epa.gov).
In practice, ORP shows when the reaction is complete. As reducing agent enters, ORP falls. When all Cr⁶⁺ has become Cr³⁺, ORP stabilizes. A common control scheme is to add bisulfite until ORP = +300 mV, then stop (nepis.epa.gov). If ORP stops falling above the setpoint or bounces back up, reduction is not complete or an interfering oxidant is present.
EPA warning: dissolved oxygen or Fe³⁺ can consume the reducing agent and inhibit chromium reduction (nepis.epa.gov). Good practice is to drive off oxidants (for example, nitrogen purging) and keep ORP under control. The sensor usually uses a gold ORP electrode that resists sulfite “poisoning” (yokogawa.com). It feeds back to the automatic dosing system for acid and reducing agent. A lower ORP setpoint (for example +250 mV) gives an additional safety margin, but most plants use ~+280–300 mV. Integrating a dosing pump helps hold the setpoint precisely.
Cr³⁺ precipitation at pH 7.5–9.0
After reduction, the water contains Cr³⁺. The next step is to raise the pH so that solid Cr(OH)₃ forms. Usually caustic (NaOH) or lime (Ca(OH)₂) is added to reach pH 7.5–9.0. Many sources cite an optimum around pH 8–8.5.
One field process works like this. Mix for about 15 minutes at pH 2 during reduction. Then raise the pH to 8.5 and stir for about 15 minutes more to complete precipitation (nepis.epa.gov). In the alkaline pH zone, Cr³⁺ quickly forms gelatinous floc Cr(OH)₃. A coagulant (for example FeCl₃) is sometimes added at the same time to aggregate the precipitate and improve settling. coagulant options are relevant at this stage, and flocculant helps combine fine Cr(OH)₃ flocs so they settle faster. The mixture then enters a settler such as a clarifier or thickener until the Cr(OH)₃ sludge settles. That sludge is then thickened and dewatered, for example with a filter press and sludge dewatering polymer. The clear effluent can be disinfected or polished as needed.
Process sequence and control automation
The usual sequence is: equalization (if needed) → acid addition → reducing agent addition with ORP control (Cr⁶⁺ → Cr³⁺) → neutralization to high pH (Cr³⁺ → Cr(OH)₃ precipitate) → solids separation. pH and ORP analyzers monitor each stage continuously to make sure the target is reached.
Modern control systems use on/off and proportional modes to hold the setpoint (yokogawa.com). In practice, ORP is the most direct way to sense the disappearance of Cr⁶⁺. Operators adjust the reducing agent rate so that ORP stays in the target band until the setpoint indicates complete reduction (nepis.epa.gov).
Performance, reaction time, and chemical consumption
With proper control, chemical reduction can practically eliminate Cr⁶⁺ from the effluent. Many plants report final Cr⁶⁺ <0.1 mg/L, which meets strict limits. The reduction‑plus‑precipitation sequence, with tight pH and ORP control, routinely produces effluent with Cr⁶⁺ below 0.1 mg/L.
Another example comes from groundwater remediation, but the chemistry is analogous. Ferrous sulfate reduction plus iron coagulation lowers 100 μg/L Cr⁶⁺ to non-detect and total Cr <5 μg/L (researchgate.net), reaching ppb levels. Performance depends on pH/ORP control, sufficient contact time, and adequate separation of Cr(OH)₃ sludge.
The reaction kinetics are fast, usually only minutes, if mixing is good and pH is low. An instrumentation application note states that the reaction time is only a few minutes once the conditions are reached (yokogawa.com). However, a retention time of 15–45 minutes is common to make sure the conversion is complete, especially in large tanks. Overall, reduction/precipitation is a well-established industrial process and the most common method of chromium removal (nepis.epa.gov). Electrochemical alternatives are used less usually.
Key metrics: reducing-agent dose per gram of Cr, final effluent Cr⁶⁺ concentration, and Cr content in the sludge. NaHSO₃ is usually 3–4 times the stoichiometric requirement, about 3–4 g NaHSO₃ per g Cr removed. FeSO₄ needs ~3 g FeSO₄ (monohydrate) per g Cr (compared with ~153 g/mol Fe(II) vs 52 g/mol Cr). The wastewater pH is low (≈2) at the start, then the final effluent pH is ~8. For example, treating 1 kg Cr⁶⁺ consumes ~3–4 kg NaHSO₃ plus acid, versus ~3 kg FeSO₄. Sludge volume is roughly proportional to the accompanying species. FeSO₄ produces more sludge than NaHSO₃ because of Fe(OH)₃.
Compliance and final verification
Meeting a regulatory target (for example, 0.1 mg/L Cr⁶⁺) needs verification that reduction is complete. Therefore continuous ORP monitoring and final Cr⁶⁺ analysis are important. If Cr⁶⁺ spikes above the target, the stream can be re-dosed or re-acidified for re-treatment. This control strategy uses the data to make sure the redox reaction is truly complete before precipitation. The effluent then complies with the standard (researchgate.net).
Primary sources: authoritative reviews and case studies, including U.S. EPA guidelines and field manuals (nepis.epa.gov, nepis.epa.gov), industry technical bulletins (yokogawa.com, nepis.epa.gov), peer-reviewed pilot studies (researchgate.net), and applicable Indonesian environmental regulations. The figures and parameters in this article refer directly to those sources.
For implementation at the plant, our team helps you select PAC/ACH coagulants, flocculants, dosing pumps, clarifiers, and dewatering equipment that suit your metal plating wastewater. We support you from jar tests to operation. See our range of water treatment chemicals or contact the technical team to discuss the reduction–precipitation process at your facility.