Heavy-oil refinery effluent in Liaoning, China carried about 24.2 mg/L total nitrogen (TN, total oxidized and reduced nitrogen) after a cyclic-activated sludge stage (CAST). Most of it was nitrate (NO₃⁻–N) (pmc.ncbi.nlm.nih.gov). That is a problem where local discharge rules demand TN below 15 mg/L and national standards target TN below 30 mg/L (Chinese GB 31570‑2015: TN < 30 mg/L, Liaoning local: TN < 15 mg/L) (pmc.ncbi.nlm.nih.gov).
Refineries meet those limits with a pairing that is now classic: an aerobic zone for nitrification (oxidizing ammonium, NH₄⁺–N, to NO₃⁻–N) followed by an anoxic zone for denitrification (reducing NO₃⁻ to nitrogen gas). In healthy operation, the aerobic step alone usually strips more than 90–95% of ammonia. Effluent NH₄–N lands around 1–5 mg/L (mdpi.com). Plants that package this into "nutrient removal" trains increasingly use commercial modules built for low-nitrogen effluent, such as nutrient removal systems for N and P polishing.
Aerobic nitrification zone design
The aerobic reactor is a well‑mixed basin with continuous aeration. In it, autotrophic nitrifiers (Nitrosomonas and Nitrobacter) convert NH₄⁺–N → NO₂⁻–N → NO₃⁻–N. Reported ammonia removal is >90–95% and effluent NH₄–N is about 1–5 mg/L (mdpi.com). Dissolved oxygen (DO, oxygen dissolved in water) is held high enough to saturate the nitrifiers. In practice this is usually ≥2 mg/L and 3–5 mg/L, because the growth rate rises with DO up to about 5 mg/L (water.mecc.edu). Sludge retention time (SRT, average solids residence) runs long, about 10–20 days at ~20–25°C, to keep the slow-growing nitrifiers. Mixed liquor volatile suspended solids (MLVSS) usually sit around 3–5 g/L.
Hydraulic retention time (HRT, average water residence) is sized to the ammonia load. Reference pilots used between ~24 and 8 hours under different stages (pubs.rsc.org). Nitrification also consumes alkalinity, about 7.1 g CaCO₃ per gram of NH₄–N oxidized. Therefore buffering is common, to keep pH (acidity/alkalinity) in the ~7.5–8 sweet spot. Nitrifiers become inhibited below ~pH 6.5 (water.mecc.edu). When supplemental caustic is fed, plants usually meter it with a reliable chemical feed such as a dosing pump, so the pH does not swing.
Anoxic denitrification zone design
The anoxic tank is mixed but not aerated, so DO falls to almost zero. Here, heterotrophic denitrifiers use nitrate as an electron acceptor and soluble organic carbon (COD, chemical oxygen demand) as donor, reducing NO₃⁻ → N₂. Operators keep the nitrate load steady by recycling nitrified mixed liquor at 2–4× the influent flow. Carbon dosing is usually needed: complete NO₃⁻–N removal targets a COD/NO₃–N mass ratio around 4–5, and one study by Dong et al. used acetate at C/NO₃–N = 3.75 to achieve roughly 98% NO₃ removal (pubs.rsc.org). Denitrification kinetics are first‑order with respect to nitrate (and carbon), so designers provide enough HRT, usually 6–8 hours, to drive NO₃⁻–N to near‑zero.
In one refinery pilot, a denitrification reactor with polyurethane carriers (20% filling) and acetate addition was placed upstream of an aerobic biofilm reactor (Fig.1 in pmc.ncbi.nlm.nih.gov). At “optimum” settings, HRT ~8 h and COD/NO₃–N ≈ 3.75, the denitrifier reached a volumetric nitrogen removal rate of 0.82 kg N/m³·day (pmc.ncbi.nlm.nih.gov). Nitrate-N removal was 97.7% (residual ~0.7 mg/L NO₃⁻) and TN removal was ~81.5% (effluent ~6.3 mg/L TN) in the denitrifier itself (pubs.rsc.org). The downstream aerobic stage then polished COD and residual nitrogen to about 1.5 mg/L TN. That is well under the 15 mg/L limit (pubs.rsc.org).
Alternate biological configurations
Many plants use the same aerobic/anoxic principles with biofilm carriers or batch cycles. Simultaneous nitrification–denitrification (SND) happens naturally in biofilms. The outer layers stay aerobic for nitrifiers and the deeper layers stay anoxic for denitrifiers (communitysewer.com). Moving‑bed biofilm systems that use this diffusion gradient are widely used. Packaged systems such as MBBR modules provide the media and mixing to sustain high-rate biofilms. fixed-bed bio reactors offer immobilized surfaces for a similar effect.
Sequencing batch reactors (SBRs, time‑phased fill–react–settle cycles) and aerobic granular sludge (AGS, dense microbial granules) also give high nitrogen removal when heterotrophic carbon is present. Morgan et al. reported about 92–94% NH₃–N removal with aerobic granules and effective simultaneous TN removal (mdpi.com, mdpi.com). Where batch flexibility is needed, commercial SBR systems handle variable loads, keep BOD removal above 90% and enable SND epochs.
Operating parameters and control
DO control: In the aerobic zone, keep DO at ≥ 2 mg/L. Operators usually hold 2–3 mg/L, and nitrifier growth increases up to ~5 mg/L (water.mecc.edu). In anoxic tanks, DO must be near zero. Even 0.1–0.2 mg/L can inhibit denitrification. Berto et al. (2015) cut DO to ~0.1 mg/L with a post‑anoxic oxygen‑stripping step and lifted denitrification efficiency to about 91% (mdpi.com). Plants usually use DO probes or ORP (oxidation‑reduction potential) sensors ahead of the anoxic tank to make sure DO stays below ~0.1–0.2 mg/L.
pH and alkalinity: Nitrification produces acid. Without buffering, pH can drop below the ~7.5–8 optimum and inhibit nitrifiers below ~6.5 (water.mecc.edu). Denitrification tends to raise pH, but nitrification usually dominates net acid/base balance. Operators monitor pH and add alkalinity (for example NaOH) when it falls toward 6.5. They usually meter it with a dosing pump for tight control.
Temperature: Nitrification depends a lot on temperature. The best range is ~28–32 °C. Below ~16 °C the rate can fall to about 50% of its 30 °C value, and nitrification stops below ~5–10 °C (water.mecc.edu). A 10 °C rise about doubles the rate (water.mecc.edu). Indonesian refineries usually work in a warm climate (20–30 °C), so nitrification runs well. However, operators track temperature because a shift of a few degrees can change the rate quite a lot.
Sludge age and biomass: Nitrifiers grow slowly (doubling time ≈8–12 h at 25–30 °C). Therefore SRT is kept long, usually more than 10 days, to prevent washout. If SRT drops below ~5–7 days, ammonia breakthrough is likely. MLVSS in aerobic tanks usually runs 3–5 g/L. Denitrifiers grow faster. However, high RAS (return activated sludge) rates make sure both flocs and nitrate‑rich liquor go back to the anoxic zone.
Carbon to nitrogen: Denitrification stalls without enough carbon. Designers aim for C/NO₃–N mass ratios of ~3–7:1. Dong et al. found a COD/NO₃–N mass ratio of ~5.4 (with acetate, equivalent to ~3.75 on a molar C/NO₃–N basis) was needed for full denitrification (pubs.rsc.org, pmc.ncbi.nlm.nih.gov). Too little carbon leaves elevated NO₃–N or TN. Too much drives sludge yield and effluent BOD up. Many teams adjust carbon feed using online NO₃–N and organic carbon signals. This fits automated dosing pump control well.
Time scales: The cited pilot’s denitrifier ran best at ~8 h HRT with C/N of 3.75. Shortening HRT to 6 h gave incomplete nitrogen removal (pubs.rsc.org). Full‑scale aerobic basins usually run 4–12 h HRT for nitrification, while anoxic tanks run ~1–4 h plus internal recycle. A common strategy is to size the anoxic HRT so carbon is nearly exhausted under the recycle NO₃⁻ load. Then trim aeration and sludge rates to hit the remaining BOD and ammonia targets.
Other controls: Plants usually monitor effluent NH₄–N, NO₃–N, and TN. ORP in the anoxic zone gives early warning of oxygen intrusion. Some facilities use online ammonia probes at the aerobic effluent to adjust aeration or RAS. In colder climates or high‑load campaigns, backup tanks or phased commissioning keep the plant reliable.
Performance outcomes and benchmarks
Properly designed systems usually produce effluent ammonia below 3 mg/L and TN in the single digits (mdpi.com, mdpi.com). The Dong et al. cascade on heavy‑oil refinery wastewater delivered effluent NO₃–N ≈0.7 mg/L and TN ≈1.5 mg/L (pubs.rsc.org). That clears the 15 mg/L local TN bar easily (pmc.ncbi.nlm.nih.gov). Overall TN removal in such systems usually spans 80–95%. In the same study, TN dropped by ~81.5% in the denitrifier and further to >94% after the aerobic stage (pubs.rsc.org). Morgan’s aerobic granules achieved ~87% TN removal with minimal NOₓ in the effluent (mdpi.com).
In GM943 rinsing cases, nitrification usually brings NH₄ below detection. For example, Morgan et al. reported 93–94 ± ~15% NH₃–N removal in nitrifying SBRs (mdpi.com). Alternate batch and biofilm approaches are easy to find on the market, such as SBR packages and MBBR carriers. These can be set up with the same DO, carbon and HRT controls described above.
Bottom line
Combining aerobic nitrification and anoxic denitrification can drive refinery effluent nitrogen to very low levels. It needs adequate aeration, mixing, retention time and carbon supply. With tight control of DO, pH/alkalinity, temperature, carbon-to-nitrate ratio, SRT/MLVSS and HRT, published case studies show that more than 95% of ammonia and nitrate can be removed (pubs.rsc.org, mdpi.com). Therefore the plant can reliably meet stringent discharge standards. For utilities and operators mapping upgrades, these data-backed design and control guidelines are practical scaffolding for implementation. They also align cleanly with modular “nutrient removal” and biofilm options available today.
We compiled these design criteria and performance benchmarks from authoritative studies and reviews on refinery wastewater nitrification and denitrification (pmc.ncbi.nlm.nih.gov) (pubs.rsc.org) (mdpi.com) (mdpi.com) (mdpi.com) (water.mecc.edu). We also used regulatory standards and industry reports.