Mining
Hauling Road Dust Suppressant
Updated
Hauling road dust suppressant for mine haul roads in Indonesia: road condition assessment, product selection, water truck application planning, site trials, and performance monitoring.
Need it fast? Our stock is ready to ship.
Our stock is ready for fast delivery.
- Dispatched within 3 business days of PO
- Talk directly with our technicians
- Zoom or in-person meetings
- Measured field trial on your site
A hauling road dust suppressant is a chemical added to the water truck water to control dust on unpaved mine haul roads. Water penetrates faster, fine particles are bound to the surface, and moisture lasts longer. Therefore watering intervals can be extended. PT Beta Pramesti Asia supplies TERRAGARD STR 750 and STR 754 for haul roads in Indonesia, with field trials on site.
Updated: 12 November 2026.
This page is part of TERRAGARD dust suppressants for mines. That page compares dust control on haul roads, stockpiles, conveyors, and crushers.
Why does haul road dust need to be controlled?
Haul road dust forms when heavy vehicle tyres grind the road surface and release fine particles. Vehicle turbulence and wind then carry them into the air. Consistent control helps with:
- Operational safety: better operator visibility, especially at bends, intersections, and two-way traffic areas.
- Worker and community health: lower dust exposure for operators, field crews, and settlements along the haul road.
- Road and equipment life: a bound surface loses fines more slowly. Therefore you need less grading and resheeting, and air filters and vehicle components wear less.
- Water efficiency: water alone evaporates quickly, so water trucks must make repeated passes. The right chemical program can extend the interval between applications.
- Environmental compliance: supports particulate emission control in line with site environmental requirements and permits.
What types of haul road dust suppressant are there?
| Type | How it works | Advantages | What to assess |
|---|---|---|---|
| Water only | Temporarily wets the surface | Simple and readily available | Short-lived, evaporates quickly, needs repeated watering, and can make roads slippery if overapplied |
| Hygroscopic salts (e.g. CaCl₂, MgCl₂) | Absorb moisture from the air to keep the surface damp | Effective where humidity is sufficient | Can be washed out by rain, may be corrosive to vehicles, and needs review of impacts on water and vegetation |
| Polymers or organic resins (e.g. lignosulfonates, synthetic polymers, enzymatic binders) | Form a binding layer of particles on the road surface | Longer-lasting with fewer applications | Needs surface preparation, curing time, and compatibility with the road material |
| Oil or bitumen-based | Form a dust-sealing layer | High durability under heavy traffic | Environmental impact and slippery surfaces if not properly managed |
No single type is best for every site. Choose based on road conditions and what you need to control. Do not choose on the price per litre alone.
Which TERRAGARD product is used on haul roads?

TERRAGARD STR 750 and STR 754 are both dispersions of synthetic polymer resins, wetting agents, and additives in water. The wetting agent speeds water penetration and improves water retention on the road surface. Repeated applications have a cumulative effect that keeps subsoil moist longer, depending on soil type, traffic, and weather. Both are added directly to the water truck tank, with a dosing pump if preferred.
| Parameter (data sheet) | TERRAGARD STR 750 | TERRAGARD STR 754 |
|---|---|---|
| Form | Milky white emulsion | Milky white emulsion |
| Specific gravity | 0.95–1.05 | 0.97–1.07 |
| pH | 6.0–8.0 | 6.0–8.0 |
| Starting dilution | 0.1–0.3% in water | 1–5 litres of product per 1,000 litres of fresh water |
| Coverage | Maximum 1–2 litres of solution per m² per watering | 1 litre of solution for 1–3 m² |
| Initial frequency | Day 1: 6 waterings 60 minutes apart, then reducing step by step to 2–3 on day 5 | 3–5 times a day for the initial treatment, 1–3 times a day for follow-up |
| Packaging | 25, 200, or 1,000 litre HDPE | 25 kg, 200 kg, or 1,000 kg IBC |
According to the data sheets, traffic does not need to stop for watering. However, avoid overwatering at bends. These figures are starting points. The field trial sets the final dilution, coverage, and interval.
What determines field performance?
- Road material: fines (silt) content, aggregate grading, and how well the surface absorbs the product.
- Traffic: number of trips, vehicle weight and type, speed, and braking or uphill zones.
- Road geometry: grade, bends, intersections, road width, and drainage.
- Weather: rainfall, dry season, surface temperature, humidity, and wind direction.
- Application system: water truck capacity, spray bar type, pump pressure, water source and quality, and watering routes.
- Road maintenance: grading schedule, material top-up, and pothole repair. Grading after application can break the binding layer if schedules are not aligned.
How is it applied?
- Usually applied with a water truck fitted with a spray bar, using product diluted to the recommended ratio.
- Programs usually start with a more concentrated initial treatment to build the binding layer, followed by periodic maintenance applications.
- The road surface should be graded and compacted before the initial treatment so the product penetrates evenly.
- Dosage, dilution, and application frequency are set from site data and trial results, not universal figures.
- The application rate is measured from spray bar flow and truck speed: rate (L/m²) = flow (L/min) ÷ (speed (m/min) × spray width (m)). Worked example of product demand: a 20,000-litre water truck at 0.2% dilution needs 40 litres of STR 750.
How do you select and trial the right programme?
We recommend a controlled trial before you roll a program out across the haul road network:
- Choose a test segment and a control segment with comparable traffic, material and weather exposure.
- Record a baseline: visual dust conditions or dust measurements, watering frequency, water consumption and grading schedule.
- Apply the program according to the agreed dilution plan and water truck route.
- Monitor performance: effective duration between applications, visibility, water and product consumption, and surface condition after rain.
- Count the trips saved: compare water truck trips and water volume per shift on the trial section against the control section.
- Compare total cost: weigh product cost against savings in water, water truck operating hours, hauling hours no longer lost and road maintenance. Do not look at the product price alone.
What are the environmental and safety considerations?
Dust suppressant selection should consider toxicity to plants and animals, potential pollution of groundwater or nearby water bodies, biodegradability, corrosion risk to vehicles, and slippery surface risk. Safety data sheets (SDS), storage requirements, and handling procedures should be available to the field team, and the team should understand them.
A dust suppressant is one layer of control. It does not replace good road maintenance, vehicle speed management, adequate drainage, dust exposure monitoring, PPE, or the safety and environmental requirements that apply on site.
What does Beta’s service cover?
PT Beta Pramesti Asia can review haul road conditions, traffic data, water availability, water truck equipment, and performance targets before setting up a trial. Services can include product selection, dilution and application route planning, trial criteria, operator guidance, and performance monitoring.
Our stock is ready for fast delivery: dispatched within 3 business days of PO. Contact us to discuss with our technicians and book a Zoom or in-person meeting.
For dust from coal stockpiles, conveyors, crushers, and transfer points, see coal dust suppressant. Its dust mechanisms and application methods differ from haul roads. See also our mining chemicals range for other mining applications.
What should you send us for a quotation?
- A map or layout of the haul road, with the length and width of the sections to treat.
- Traffic data: number and type of units, trips per hour or per day.
- Current watering: number and capacity of water trucks, frequency, water source.
- Road material and grading schedule.
- Estimated hauling hours slowed or stopped by dust.
- Photos or videos of current dust conditions and the delivery location.
Frequently asked questions about haul road dust suppressants
Is watering alone enough?
Water can suppress dust for a short time. However, it evaporates quickly, especially at midday and in the dry season. Therefore water trucks must make repeated passes. A dust suppressant program can extend control duration and reduce water use, once its performance has been proven in a trial.
Do dust suppressants make roads slippery?
Slip risk depends on the product type, dosage, and surface condition. Therefore dilution and application rates need to be controlled, especially on inclines, declines, and bends. We take this into account when designing the program.
How does rain affect performance?
Heavy rain can wash out part of the product, particularly water-soluble types. Programs are usually adjusted to seasonal patterns, for example more frequent applications in the dry season and reapplication after rainy periods.
What dilution do STR 750 and STR 754 use?
The data sheets give a starting dilution of 0.1–0.3% for STR 750 and 1–5 litres of product per 1,000 litres of water for STR 754. These are the basis for the trial. The final dilution is set from the results on the trial section.
How quickly can the product be delivered?
Our stock is ready for fast delivery: dispatched within 3 business days of PO. Contact our team to confirm availability and the delivery schedule to your site.